- Status Closed
- Percent Complete
- Task Type Patches
- Category Plugins
- Assigned To No-one
- Operating System Sansa e200
- Severity Low
- Priority Very Low
- Reported Version Daily build (which?)
- Due in Version Undecided
-
Due Date
Undecided
-
Votes
1
- revelations (2007-08-12)
- Private
FS#7076 - Calendar Button map for sansa
I made a Button map for the sansaE200.
Just #ifdef's nothing fancy.
Added some whitespace to the menu.
Used Rec to quit.
Also fixed an off by one error, that crashed it every time.
I was waiting for someone to do this but nobody did.
GRaTT
Closed by nls
2008-10-25 17:53
Reason for closing: Out of Date
Additional comments about closing: Warning: Undefined array key "typography" in /home/rockbox/flyspray/plugins/dokuwiki/inc/parserutils.php on line 371 Warning: Undefined array key "camelcase" in /home/rockbox/flyspray/plugins/dokuwiki/inc/parserutils.php on line 407
2008-10-25 17:53
Reason for closing: Out of Date
Additional comments about closing: Warning: Undefined array key "typography" in /home/rockbox/flyspray/plugins/dokuwiki/inc/parserutils.php on line 371 Warning: Undefined array key "camelcase" in /home/rockbox/flyspray/plugins/dokuwiki/inc/parserutils.php on line 407
This is superseded by another patch that
among other things added a sansa button
map to the calendar plugin.
Loading...
Available keyboard shortcuts
- Alt + ⇧ Shift + l Login Dialog / Logout
- Alt + ⇧ Shift + a Add new task
- Alt + ⇧ Shift + m My searches
- Alt + ⇧ Shift + t focus taskid search
Tasklist
- o open selected task
- j move cursor down
- k move cursor up
Task Details
- n Next task
- p Previous task
- Alt + ⇧ Shift + e ↵ Enter Edit this task
- Alt + ⇧ Shift + w watch task
- Alt + ⇧ Shift + y Close Task
Task Editing
- Alt + ⇧ Shift + s save task
A more consistant button mapping
to exit from the calendar and the keyboard screen POWER button.
to exit from menu screens SCROLL_UP
GRaTT
Hi ,,
Exuse me :)
this my frist time
I have a SanDisk sansa 8 GB
can I put this patch on it ?
and how ??
thank you
This patch is very simple.
Files patched are in /apps/plugins/
SOURCES - adds a line to compile calendar.c for the sansa
calendar.c just a couple of #ifdef to define the button mapping
run the patch command from the base rockbox directory
patch -p0 < sansa_calendar.diff
This will work for all sansa e200 series.
GRaTT
This update moves the .memo file to
/.rockbox/rocks/apps/.memo
and configures SOURCES to build for all targets.
GRaTT
Does this belong to http://www.rockbox.org/tracker/task/4760 ?
This is for calendar.c NOT rockcalendar.
I have only tried it on the sansa and sansa sim
but it works well no known bugs. I have been
using it for months and it is some builds on ABI.
GRaTT
updated to revision 16078 Jan 13
BUTTON_SCROLL_UP/DOWN to BUTTON_SCROLL_FWD/BACK
GRaTT
You did it wrong. You need DOWN to FWD and UP to BACK.
fixed for FWD/BACK
GRaTT
Sync to SVN.